Finished Surface Projects
			
			
				Construction of Access Road and Well Pad for Location E021 – Khangiran Gas Field
			
				This project was undertaken to provide a drilling site and access road for ICOFC operations at location E021 in the Khangiran Gas Field. The successful and timely execution supported increased production capacity.
			
				
					
						
							|  | Contract Type: C | 
						
							|  | Contract duration: 6 months | 
						
							|  | Employer: Iranian Central Oil Fields Company (ICOFC) | 
						
							|  | Location: Khorasan Razavi Province – Sarakhs   – Khangiran Gas Field |