Completion of remaining works for flowline replacement of wells, construction of wellhead facilities for Well No. 9 at Gavarzin Gas Field, and gas transfer to Hengam Gas Processing Facilities 11 ⁄ 2 ⁄ 2025
Installation of Two Turbo Compressors to Existing Turbo Compressors at Gas and NGL Plants 700 and 800 25 ⁄ 4 ⁄ 2023
Construction of a 12-Inch Above-Ground Pipeline Along the New Mahshahr Pipeline Corridor 27 ⁄ 12 ⁄ 2016
Procurement and Installation of Wellhead Facilities and Flowline for E127N Well – Tabnak Field 22 ⁄ 12 ⁄ 2013
Procurement and Installation of Wellhead Facilities and Flowline for E113S Kangan Well + 3 Additional Wells 17 ⁄ 9 ⁄ 2011
Construction of Replacement Facilities Due to Gotvand-e-Olya Dam / Dismantling of Submerged Wellhead Facilities and Pipelines, and Construction of Replacement Pipeline 12 ⁄ 12 ⁄ 2009
Procurement and Installation of Valves and Fittings on Light Gas Line at NGL-1600 Plant 12 ⁄ 9 ⁄ 2018
Procurement and Installation of Wellhead Facilities and Construction of Flowline for Wells 52 and 53 Khangiran 27 ⁄ 7 ⁄ 2008
Procurement and Installation of Wellhead Facilities and Flowline for Well No. 8 – Shanul 12 ⁄ 10 ⁄ 2006
Procurement and Construction of 16-Inch Gas Pipeline from Central Collection to Khangiran Metering Station 10 ⁄ 7 ⁄ 2016
Procurement and Installation of Wellhead Facilities and Flowline for Wells 11 and 12 – Shanul 28 ⁄ 6 ⁄ 2010