Finished Surface Projects
			
			
				Procurement of Single-Wall Polyethylene Pipes – 70 mm (PN6) and 450 mm (PN6)
			
				This project supported the rehabilitation and optimization of Khuzestan’s water and Sewage network, damaged by the 2018–2019 floods. The company played a key role by timely supplying required polyethylene pipes.
			
				
					
						
							|  | Contract Type: P | 
						
							|  | Contract duration: 3 months | 
						
							|  | Employer: Khuzestan Water and Sewage Company | 
						
							|  | Location: Khuzestan province |